EN|VN

  • social icon
  • social icon
  • social icon
  • social icon
  • social icon
News

Industry News

Inauguration of the Facility 2 project of Oncology Hospital, investment capital of more than 5,800 billion VND

12-10-2020

Inauguration of the Facility 2 project of Oncology Hospital, investment capital of more than 5,800 billion VND

Today (October 12), Ho Chi Minh City inaugurated the construction investment project of Campus 2 of Ho Chi Minh City Oncology Hospital. This is a project with a total investment of more than 5,800 billion VND, with a scale of 1,000 hospital beds. Investment project to build Facility 2 Ho Chi Minh City Oncology Hospital was started in June 2016. This project is built on a total area of ​​55,594 m2, construction floor area of ​​112,582 m2 in Tan Phu ward, District 9, City. Ho Chi Minh. Investment capital from the state budget and other legal capital sources, with a total investment of more than 5,800 billion VND.

Facility 2 Ho Chi Minh City Oncology Hospital is one of five hospitals under the Investment Project to build 5 new hospitals, central and terminal hospitals located in Ho Chi Minh City.

 

Facility 2 of Ho Chi Minh City Oncology Hospital. Ho Chi Minh City has a scale of 1000 beds, built with a full range of outpatient medical examination and treatment areas, subclinical and medical diagnosis areas, administrative areas, technical infrastructure systems and ancillary works aid. The system of modern equipment is fully equipped to meet the needs of medical examination and treatment when the hospital operates at its full design scale.

The highlight of this project is the main block located in the center of the land, with a construction area of ​​16,925 m2, total floor area of ​​the floating surface 84,351 m2, basement floor area 28,230 m2. This building block is 10 floors high, including 3-storey podium, 2 6-storey tower blocks, technical floor, 2 basements.

Investment project to build Facility 2 Ho Chi Minh City Oncology Hospital has a total investment of more than 5,800 billion VND. Photo of Le Toan.

Before the inauguration, Facility 2 Ho Chi Minh City Oncology Hospital received medical examination and treatment for patients from October 2. According to Mr. Diep Bao Tuan, Deputy Director of Oncology Hospital, initially, Facility 2 Ho Chi Minh City Oncology Hospital will receive about 400 patients/day. It is expected that by the end of December 2020, the reception capacity will increase to 1,000 patients/day. By the first quarter of 2021, when Facility 2 is eligible to receive inpatients, all inpatients will be transferred to Facility 2, Ho Chi Minh City Oncology Hospital.

Facility 2 Oncology Hospital helps reduce the overload of cancer patients in the city. Ho Chi Minh and the southern provinces.

Credit: Báo Đầu tư
https://baodautu.vn/khanh-thanh-du-an-co-so-2-benh-vien-ung-buou-von-dau-tu-hon-5800-ty-dong-d131145.html

related

Grand Opening of HCMC Oncology Hospital (2nd branch) with 1.000 beds

Ho Chi Minh City Oncology Hospital (2nd branch) was inaugurated on October 12 with an investment of 5,845 billion VND. The hospital has 1,000 beds according to international standards and lots of modern

New Diagnosis Centre of HCMC Oncology Hospital 2nd Branch begins to operate

On October 12, the new examination area of ​​Ho Chi Minh City Oncology Hospital (Ho Chi Minh City), facility 2 with a scale of 1,000 beds was officially inaugurated, which is expected

New City Thu Thiem: Set new standard for Home and Future Investment

New City Thu Thiem possesses worthy living values ​​such as a prime location, green living space and sustainable assets of the future, suitable for the Millennial generation, a young, successful working class,

25-08-2020

Inauguration of Oncology Hospital 2 with 1,000 beds

Oncology Hospital (2nd branch) was inaugurated on October 12 with an investment of 5,845 billion VND. The hospital has 1,000 international standard modules and lots of modern machines. Oncology Hospital (2nd branch)

23-02-2021

Ho Chi Minh City: Oncology Hospital’s 5,000 billion VND facility is officially operational

The 5,000 billion Oncology Hospital is officially in operation PHOTO: BINH NGON   On the morning of October 12, the inauguration ceremony of the medical examination area under the construction investment project

12-10-2020

“Guu” chooses the home of successful young people: Class from location to living space

Tran Khiem, who lives in Binh Thanh, shared: “It is difficult to find an apartment in the central area that is convenient for daily commute, but still ensures an open and close

02-09-2020

High quality living space in New City Thu Thiem

New City Thu Thiem apartment building creates a high-quality living space with high-class facilities, in harmony with the natural landscape, well connected with the center. Oriented to become the new financial center

19-08-2020

Handover Ceremony of Ho Chi Minh City Oncology Hospital

On June 15, 2020, the handover ceremony of Ho Chi Minh City Oncology Hospital. Ho Chi Minh - Campus 2 went well with the participation of: - Representative of the Investor, Construction

15-06-2020

TALENTED ENGINEER PROGRAM | DEFEND GRADUATION THESIS

On December 27, 2019 at Room S.04.01 Smart Building, University of Science and Technology - University of Danang, the students who intern at Thuan Viet Construction and Trading Co., Ltd. successfully defended

27-12-2019